Stage Six · Executive Presentation Sandbox
Investor demo mode
A sealed sandbox for live stakeholder pitches. Scenarios are scripted and rendered locally — no network dependency — while the intensity control drives the real swarm scoring, sovereign node routing and remediation planner in front of the room.
Scenario deck
pre-configuredSevere geomagnetic storm
step 0 · local playbackA halo CME arrives at L1. Gauss-Sentinel raises radiation posture, safes vulnerable payloads and reroutes downlinks away from the auroral oval.
Solar wind
655km/s
Kp index
6.1
Carrier lock
79.4%
Escalations
5
- L1 solar wind crosses 780 km/s, Kp climbs to 8
- Gauss-Sentinel escalates radiation posture to CRITICAL
- LEO drag correction queued for 4 constellations
- Downlink carrier lock recovered via Muscat failover
Swarm response
live scoring on scripted telemetry- swarm-helio-01critical
declared radiation storm — EVA windows suspended
score 0.81 · escalated to GAUSS-HELIO
- swarm-orbit-03warning
recomputed drag model and conjunction screen
score 0.64 · escalated to ORBITAL-OPS
- swarm-signal-04critical
re-tuned downlink and re-acquired carrier lock
score 0.63 · escalated to GROUND-MESH
- swarm-mesh-02elevated
rebalanced federation gateway routes
score 0.75 · escalated to GAUSS-GATEWAY
- swarm-ironsight-02critical
escalated theater alert to watch officers
score 0.40 · escalated to IRONSIGHT
Sovereign routing
in-country inference- Kuwait City · PrimaryOllama73%
- Manama · Recon annexQwen76%
- Doha · Theater fusionGranite47%
- Abu Dhabi · Downlink edgeGemma66%
- Muscat · Cold standbyOllama6%
5 remediation plans queued for this scenario
Ephemeris ingestion load test
archive stabilityReading archive…
Sandbox session
ephemeral · auditedNo sandbox open. Sessions expire automatically.
Reading session ledger…
- TLS 1.3 · HSTS enforced on every channel
- RBAC gate: investors read-only, engineers dispatch
- Audit trail immutable · sandbox state ephemeral